Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Note

The TimingDriven efficiency is in continuous development and improvement.

...

Floor planning

In order to give indications to the tool, the user can set up a floor-planning and pass it through the tool working directly on the whole design with ConstrainModule or ConstraintPath methods or working with unitary runs before integrating in the top design . Please refer to #Floor_planning.as specified in #Floor_planning_Preplace_ip.

First of all, ConstrainModule methods as explained in #Floor_planning_Constrain_module must be applied in order to concentrate parts of the design and place them close to other ones if interconnections between them.

In addition, ConstraintPath methods as explained in #Floor_planning_Constrain_path_between_registers must be applied if some path go trough multiple modules or for last critical paths.

Note

With this solution, the user must pay attention to interconnections between modules and between module and output interfaces.